news_bridge50

Polyurethane Underpinning using Structural Injection

Bridge 50 ECMT, Tauranga A new rail bridge in Tauranga had ground settlement, causing the construction joints between the concrete segments to open allowing ground water to pass through. The concern was that fines in the sub-grade material beneath the segments would wash through the construction joints and eventually undermine the bridge. To prevent this Read More