FRP & Concrete Repair

news_hope_gibbons

Hope Gibbons Building, Wellington

Concrete Solutions® have carried out extensive concrete repair and FRP strengthening to the Hope Gibbons Building which was constructed in 1925 and has recently been brought up to 80% NBS. As part of the strengthening program, stairwells and shear walls were strengthened with Tyfo® SCH-41. Concrete repairs were carried out with the use of MC-Zentrifix KMH and MC-Nafufill KM 250

Products: